How much does an electrician cost in Toronto?
An electrician in Toronto charges $95 to $160 an hour in regular hours. Most charge a service call or minimum of $150 to $300, which usually covers the first hour. A panel upgrade from 100 to 200 amp costs $1,700 to $6,500, and an underground service, mast work or old wiring behind the walls push it toward the top.
By the CostGuide.ca editorial team. Published 18 November 2026. Prices checked November 2026. The ranges combine published prices from 6 local contractors and suppliers, not averages. Sources are listed at the end of the page.
Get a quote from a local electrician
How much does an electrician charge in Toronto?
GTA electricians bill $95 to $160 an hour in regular hours, an outlet or switch costs $80 to $350 each, and a pot light $75 to $500 per light.
Toronto electrician rates and job prices
| Job | Low | High |
|---|---|---|
| Licensed electrician hourly rate, regular hours$95 to $160per hourStandard residential work. Emergency, after-hours and specialised work cost more | $95 | $160 |
| Service call or minimum charge, usually covering the first hour$150 to $300per visit | $150 | $300 |
| Outlet or switch, replaced or added$80 to $350per outletStandard outlet or switch. GFCI and smart devices cost more | $80 | $350 |
| Pot light installation$75 to $500per lightDepends on ceiling access and how many lights | $75 | $500 |
| New circuit$300 to $600per circuit | $300 | $600 |
| Level 2 EV charger installation$800 to $3,000per jobSome prices are all in or include the new circuit. Long runs and panel work cost extra | $800 | $3,000 |
Prices in CAD as local contractors publish them. Most do not say whether 13% HST is included, so ask for HST as its own line. Checked November 2026.
The ranges on this page come from GTA electricians' and contractors' published 2026 prices, checked in November 2026. Each row runs from the lowest published figure for that job to the highest. Most sources do not say whether HST is included, so ask for it as its own line on any quote.
In Ontario, electrical work is filed with and inspected by the Electrical Safety Authority rather than the City, so this page also sets out ESA's 2026 fees. For the same jobs in Metro Vancouver, see the Vancouver electrician cost guide, or compare cities on the electrical costs across Canada page.
Get a quote from a local electrician in Toronto
Free and no obligation. Up to 2 local electricians get in touch, and we never sell your number.
How much does a panel or service upgrade cost in Toronto?
Going from 100 to 200 amp costs $1,700 to $6,500 in the GTA, a full upgrade on an underground service $4,200 to $6,500, and a sub-panel for a basement or addition $1,200 to $2,400.
Toronto panel and service upgrade prices
| Job | Low | High |
|---|---|---|
| Panel upgrade, 100 to 200 amp$1,700 to $6,500per jobGTA figures. Some include the ESA permit. Underground services and mast work cost more. Can run higher | $1,700 | $6,500 |
| Panel and service upgrade to 200 amp, overhead service$3,200 to $4,800per jobFrom 60 or 100 amp. GTA figures. ESA permit included; a new mast and meter base is extra | $3,200 | $4,800 |
| Panel and service upgrade to 200 amp, underground service$4,200 to $6,500per jobFrom 100 amp. GTA figures. ESA permit included | $4,200 | $6,500 |
| Service mast and meter base replacement, added to an upgrade$800 to $1,600per job (add-on)On top of the upgrade price | $800 | $1,600 |
| Knob and tube or aluminum wiring remediation, added to a panel upgrade$2,000 to $8,000per job (add-on)On top of the upgrade price | $2,000 | $8,000 |
| Sub-panel for a basement or addition$1,200 to $2,400per job | $1,200 | $2,400 |
Prices in CAD as local contractors publish them. Most do not say whether 13% HST is included, so ask for HST as its own line. Checked November 2026.
What changes the price of a Toronto panel upgrade?
Whether the service is overhead or underground, the state of the mast and meter base, and what the electrician finds behind the walls set most GTA panel upgrade prices.
- Overhead or underground. If your service is overhead and the mast is in good shape, the job is quicker, a GTA contractor says. An underground service costs $4,200 to $6,500, against $3,200 to $4,800 overhead. [6]
- Mast and meter base. When the mast or meter base has to be replaced as well, that adds $800 to $1,600 on top of the upgrade. [6]
- What is behind the walls. The same contractor says the biggest cost swing comes from what the electrician finds behind the wall. Remediating knob and tube or aluminum wiring adds $2,000 to $8,000, so ask for an allowance in writing. [6]
- Room for a basement or addition. A finished basement or an addition often gets its own sub-panel, at $1,200 to $2,400. Your electrician should check that the main service can carry the extra load first. [6]
How long does a panel upgrade take in Toronto?
The panel work itself takes 4 to 8 hours, but booking the utility disconnect and the ESA inspection sets the overall timeline.
Booking the utility
Toronto Hydro has to schedule the disconnect and reconnect in Toronto, and Alectra Utilities does the same across Mississauga and parts of Halton. A GTA contractor puts this step at 3 to 15 business days, often the longest wait in the job. [6]
The ESA steps
The licensed electrical contractor files the ESA notification when the job is booked. The inspection follows 1 to 10 business days after it is requested, and the final inspection produces a Certificate of Inspection for your records. [6] [7]
A day without power
The panel work itself usually takes 4 to 8 hours, so plan for most of a day without power on installation day. [6]
What permits and fees apply to electrical work in Toronto?
Electrical work in Toronto is filed with Ontario's Electrical Safety Authority, normally by a licensed contractor, and ESA charges set fees for a service change and for an EV charger, with HST applied.
Who files the permit for a panel upgrade in Toronto?
Your electrical contractor, in most cases. In Ontario, work is filed with the Electrical Safety Authority as a notification, and filing one as a contractor requires an ECRA/ESA licence (as at November 2026). Ask for the contractor's ECRA/ESA licence number before work starts. A person who files without contractor status pays the higher non-contractor fees. [7] [6]
What does ESA charge for a service upgrade?
$86 per service for a licensed contractor and $212 for a non-contractor, under ESA's 2026 fee guide, with a $92 minimum for any notification (as at November 2026). ESA says HST is applied to its fees under Canada Revenue Agency rules. Your contractor may show the fee as its own line or fold it into the job price. [7]
What does ESA charge to inspect an EV charger?
$86 for the first piece of equipment when a licensed contractor files, or $93 for a non-contractor, plus $30 ($33 for a non-contractor) for each extra piece installed at the same time (as at November 2026). The $92 minimum notification fee still applies, so a charger filed on its own costs at least that. [7]
What happens if the ESA notification is filed late?
ESA charges cost recovery of $354 for up to the first two hours, plus $177 for each extra hour, on top of the inspection fees, when a notification is not filed within 48 hours of starting work (as at November 2026). A licensed contractor normally files before work starts. Ask for the notification number so you can check. [7]
What should a Toronto electrician's quote include?
A Toronto quote should give the hourly rate or a fixed price, any call-out minimum, the old and new service size for panel work, who files with ESA and books the utility, and HST on its own line.
- The hourly rate, or a fixed price for the job, and any call-out minimum
- Your current service size and the new size, for example 100 to 200 amp
- Whether the service is overhead or underground
- Mast and meter base work, included or extra
- An allowance for knob and tube or aluminum wiring found during the job
- The contractor's ECRA/ESA licence number and who files the ESA notification
- Who books the Toronto Hydro or Alectra disconnect and reconnect
- HST as its own line
Electrical terms on a Toronto quote
- Service mast
- The pipe on an outside wall that brings overhead power lines down to the meter. A worn or short mast is often replaced during an upgrade. [6]
- ESA notification
- The filing that tells the Electrical Safety Authority work is under way so it can be inspected. It works like a permit in other provinces. [7]
- Certificate of Inspection
- The document ESA issues after the final inspection. Keep it with your home records. [6]
Toronto electrician cost questions
How much does an electrician charge per hour in Toronto?
Licensed electricians in the GTA charge $95 to $160 an hour for standard residential work in regular hours. Most also charge a service call or minimum of $150 to $300, which usually covers the first hour. Emergency and after-hours calls cost more, so ask for the rate before you book.
How much does it cost to go from 100 to 200 amp in Toronto?
In the GTA, a 100 to 200 amp panel upgrade costs $1,700 to $6,500. A full upgrade runs $3,200 to $4,800 on an overhead service and $4,200 to $6,500 underground. Add $800 to $1,600 if the mast and meter base need replacing, and check whether the ESA fee is in your quote.
How much does a Level 2 EV charger install cost in Toronto?
Installing a Level 2 charger costs $800 to $3,000 in the GTA. Some prices are all in or include the new circuit, so check what each quote covers. A long run from the panel, or a panel that has to be upgraded first, adds to the price.
Will knob and tube wiring add to my panel upgrade?
It can. Remediating knob and tube or aluminum wiring found during a GTA panel upgrade adds $2,000 to $8,000 on top of the upgrade itself. Ask the electrician to look for old wiring before quoting, so the allowance is in writing rather than a surprise.
How long will the power be off for a panel upgrade?
The installation usually takes 4 to 8 hours, so plan for most of a day without power. The longer wait often comes before that, while the utility books the disconnect, which a GTA contractor puts at 3 to 15 business days.
Do Toronto electrical prices include HST?
Most of the sources behind this page do not say. Ontario's HST is 13%, so ask for it as a separate line, along with any call-out minimum and the ESA fee, and compare quotes on the work itself.
Sources
- How much does an electrician cost in Toronto?, City Power (1800 Sheppard Ave E, North York; ECRA/ESA licence 7015314). Checked 2026-11-18.
- How Much Do Electricians Cost in Toronto & GTA (2026 Pricing Guide), Amps Logics Electric (Unit 16, 21 Goodrich Rd, Etobicoke; ESA licence 7011893). Published 2026-05-08. Checked 2026-11-18.
- How Much Does An Electrician Cost In Toronto? (2026 Price Guide), Daliran Electric (46 Mosedale Crescent, North York). Published 2026-09-25. Checked 2026-11-18.
- Licensed Electrician Toronto & GTA, Ontime Electric (51 Holland Park Ave, Toronto; ECRA/ESA licence 7009495). Checked 2026-11-18.
- Electrician in Toronto, ON, KV Bear Electrical (Oshawa; ECRA/ESA licence 7014730). Checked 2026-11-18.
- Electrical Panel Upgrade for a GTA Renovation: 100A to 200A Cost and ESA Permit Guide 2026, Red Stone Contracting (GTA renovation contractor; 7 Hamptonbrook Dr, Etobicoke, plus Oakville and Burlington offices). Published 2026-06-02. Checked 2026-11-18.
- 2026 ESA Fee Guide (effective April 1, 2026), Electrical Safety Authority (Ontario). Published 2026-04-01. Checked 2026-11-18.